亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
THIS WEEK
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Preparations for Canal Damming at Three Gorges Project Proceed Swiftly
Preparations for damming a man-made canal built to facilitate the passage of ships during the second-phase construction of the Three Gorges Project have been proceeding smoothly.

Two separate teams have been working around the clock to build two coffer dams, one upstream and the other downstream, 150 meters and 125 meters in length, respectively, said sources from the Yangtze River Three Gorges Project Development Corporation.

The man-made canal, 350 meters wide and 3.7 kilometers long, is located near the southern bank of the Yangtze, where the first two phases of the Three Gorges Project are concentrated mainly along the northern bank.

Sun Zhiyu, supervisor in charge of damming the canal, said that workers have prepared 4.6 million cubic meters of materials, including a large number of boulders, for the damming, which is scheduled for Nov. 6.

Following the damming, the Yangtze's water will mainly be discharged via 22 water diversion holes at the lower part of the dam, each 6 meters wide by 8.5 meters high. Ships and boats will pass through the dam area via the temporary ship lock.

The damming of the canal will make way for the third phase of construction on the 665-meter section on the southern bank of the Yangtze to complete the 2,309-meter-long and 185-meter-high dam.

The gigantic Three Gorges Project is situated 40 kilometers from Yichang City, in central China's Hubei Province. Construction began in 1993 and will be completed in 2009, when 26 generating units with a combined capacity of 18.2 million kilowatts will be put into operation. The permanent locks will also be able to accommodate ships of more than 10,000 DWT (dead weight tonnage) by that time.

The first group of four generating units will begin operation next year.

(Xinhua News Agency October 31, 2002)

 

2nd Damming Won't Damage Scenery of Three Gorges: Official
Firm Established for Dam Project
State Funds to Create Jobs in Three Gorges
China to Clear Three Gorges Reservoir Area
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
  • <th id="fomfv"></th><noscript id="fomfv"></noscript>

    <fieldset id="fomfv"><font id="fomfv"></font></fieldset><sup id="fomfv"><menuitem id="fomfv"></menuitem></sup>

    1. <dfn id="fomfv"></dfn>
        1. 亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放 毛片无码免费无码播放 国产精品美女乱子伦高潮 久久男人av资源网站无码 亚洲精品中文字幕AV一本 国产成年无码V片在线 特级毛片直接看不用下载 亚洲深夜无码视频