亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Chinese Women
Film in China
War on Poverty
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar
Telephone and
Postal Codes


Hot Links
China Development Gateway
Chinese Embassies
China Knowledge

Chinese National Grand Theater Nears Completion

The true face of the Chinese National Grand Theater was unveiled in Beijing on Monday when the protection film of the last 30 titanium boards was peeled off.

The controversial construction is nearly completed - the interior will be finished by the end of this year. Designed by the French architect Paul Andreu, work began in December 2001 after four years of deliberation among the country's policy makers.

Located in the heart of Beijing, near Tiananmen Square, the theater is a modern-style building which stands out from its surroundings.

"The major construction of the theater was covered with nearly 20,000 of titanium boards," said Wang Zhengming, who is in charge of the construction project. "It takes us half a month to peel off the protection film of such a large construction."

Shaped like a tear drop, the silver theater has sparked debate among domestic experts on whether such an modern design was appropriate for the center of Beijing. However, it was listed among the top ten architectural miracles by the U.S.-based Journal Business Week for its energy-saving and environmentally friendly design.

The imposing building, occupying an area of some 149,500 square meters, comprises three gigantic halls, including a 2,416-seat opera house, a 2,017-seat concert hall and a 1,040-seat theater.

"We have not yet decided who will be in charge of the daily operation of this national theater," Chinese Minister of Culture Sun Jiazheng told Xinhua. Many foreign troupes are eager to win the first performance contract with the theater.

With an investment totaling 2.69 billion yuan (about 336 million U.S. dollars) and covering a construction area of 200,000 square meters, the theater is the biggest cultural project during China's Tenth Five-Year Plan period (2001-2005).

"Therefore, we should select first-class troupes and state-of-art performances that can match the construction," Sun said, adding China is now open to all good artistic products showcasing diverse cultures.

During its construction, Wang noted, the National Grand Theater also suffered money shortages due to rising costs of raw materials. But the construction was never delayed thanks to national support and cost-saving measures.

He also revealed that the construction is scheduled to be gradually completed next June.

(Xinhua News Agency May 17, 2006)

National Grand Theater to Receive Foreign Troupes
More Problems Enter, Stage Right
Four Great Buildings to Shape Olympic Beijing
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-88828000
  • <th id="fomfv"></th><noscript id="fomfv"></noscript>

    <fieldset id="fomfv"><font id="fomfv"></font></fieldset><sup id="fomfv"><menuitem id="fomfv"></menuitem></sup>

    1. <dfn id="fomfv"></dfn>
        1. 亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放 毛片无码免费无码播放 国产精品美女乱子伦高潮 久久男人av资源网站无码 亚洲精品中文字幕AV一本 国产成年无码V片在线 特级毛片直接看不用下载 亚洲深夜无码视频