亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放

Home / Business / News Tools: Save | Print | E-mail | Most Read | Comment
Another dome added to Qinshan nuclear complex
Adjust font size:
Workers on Friday hoisted a 170-ton dome into place over the underground workshop that will house a third reactor at the second phase of the Qinshan nuclear power complex, the first commercial nuclear power facility in

China.

 

That step cleared the way for installation of a 650,000 kw pressurized water reactor at the nuclear complex, which is located in Haiyan, on the northern coast of Hangzhou Bay, Zhejiang Province, not far from Shanghai. The Qinshan complex has three phases, each featuring different types of reactor, some of which were from domestic suppliers and some from foreign manufacturers.

 

Construction of another underground workshop for a fourth generating unit is also under way, according to Yang Lanhe, General Manager of Nuclear Power Qinshan Joint Venture Co. Ltd, investor of the second phase of the Qinshan complex.

 

The first phase of the Qinshan facility was also the first nuclear power plant on the mainland built independently by domestic engineers. Construction on the facility began in 1985. The first phase featured a 300,000 kilowatt prototype reactor with a lifespan of 30 years, which went online in 1991.

 

The first phase of the plant, which suspended power generation for a fuel change starting on Oct. 28, is to resume operation in January. The complex will see the addition of two more pressurized reactors, each of which is to have an installed capacity of 1 million kilowatts.

 

The first phase has so far generated 31 billion kwh of electricity and produced 9.6 billion yuan (US$1.28 billion) in revenue and paid 1.8 billion yuan in tax.

 

The plant also has second and third phases. The second phase involves the plant where work was done on Friday. It has two functioning 650,000-kw units that began generating power in 2002 and 2004, respectively. The expansion of phase two will involve the installation of two 650,000-kw pressurized reactors. The expansion program began in April 2006. It will be fully completed and start power generation in late 2011.

 

Through Dec. 17, the second phase of the Qinshan nuclear plant had generated 8.5 billion kwh of electricity for 2007. When all four units are in operation, the second phase will be able to produce 18-20 billion kwh of electricity a year.

 

The third phase houses two Canadian CANDU heavy-water reactors.

 

(Xinhua News Agency December 29, 2007)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Home Designed Power Plant Expands
- Nuke plant's life cycle set to double
- Nuclear power plant to undergo further expansion
Most Viewed >>

Nov. 1-2 Tianjin World Shipping (China) Summit
Nov. 7-9 Guangzhou Recycling Metals International Forum
Nov. 27-28 Beijing China-EU Summit
Dec. 12-13 Beijing China-US Strategic Economic Dialogue

- Output of Major Industrial Products
- Investment by Various Sectors
- Foreign Direct Investment by Country or Region
- National Price Index
- Value of Major Commodity Import
- Money Supply
- Exchange Rate and Foreign Exchange Reserve
- What does the China-Pakistan Free Trade Agreement cover?
- How to Set up a Foreign Capital Enterprise in China?
- How Does the VAT Works in China?
- How Much RMB or Foreign Currency Can Be Physically Carried Out of or Into China?
- What Is the Electrical Fitting in China?
  • <th id="fomfv"></th><noscript id="fomfv"></noscript>

    <fieldset id="fomfv"><font id="fomfv"></font></fieldset><sup id="fomfv"><menuitem id="fomfv"></menuitem></sup>

    1. <dfn id="fomfv"></dfn>
        1. 亚洲精品无播放在线播放,精品国精品自拍自在线,免费国产污网站在线观看不要卡,97色欧美视频在线观看,久久精品本无码一本,国产精品高清视亚洲一区二区,全部无码特级毛片免费播放 毛片无码免费无码播放 国产精品美女乱子伦高潮 久久男人av资源网站无码 亚洲精品中文字幕AV一本 国产成年无码V片在线 特级毛片直接看不用下载 亚洲深夜无码视频